    混凝土擋土墻工程施工技術

    網址:www.ruposon.com  2021-07-14  作者:admin    閱讀:

    混凝土擋土墻工程施工技術
    Construction Technology of Concrete Retaining Wall
    1、基槽挖土方:本工程挖基槽土方采用挖掘挖機及人工配合進行開挖。挖基配合墻體施工分段進行,先測量放線,定出開挖中線及邊線,起點及終點,設立樁標,注明高程及開挖深度,用1m3反鏟挖掘機開挖,多余的土方裝車外運棄土。在施工過程中,應根據實際需要設置排水溝及集水抗進行施工排水,保證工作面干燥以及基底不被水浸。
    1. Excavation of foundation trench: Excavation of foundation trench in this project is carried out by excavator and manual cooperation. The foundation excavation is carried out in stages with wall construction. First, the laying-out line is measured, the middle line and side line of excavation are determined, the starting point and end point are determined, the pile mark is set up, the elevation and excavation depth are indicated, the excavation is carried out with a 1 m3 backhoe excavator, and the surplus earth is loaded outside the truck to transport the discarded soil. In the construction process, drainage ditches and catchment resistance should be set up according to the actual needs to carry out construction drainage, so as to ensure that the working face is dry and the base is not immersed in water.
    2、地基處理:當挖基發現有淤泥層或軟土層時,需進行換土處理,報請監理工程師及業主批準后,才進行施工。
    2. Foundation treatment: When a silt or soft soil layer is found in the excavated foundation, soil replacement treatment is required, which is submitted to the supervisory engineer and the owner for approval before construction is carried out.
    3、碎石墊層施工:根據設計圖紙現澆鋼筋砼擋土墻?;卒?0公分厚碎石墊層,并用打夯機夯入地基土。以便增加基底摩擦系數。予制擋土墻的基礎墊層為C10砼墊層10公分厚。
    3. Construction of gravel cushion: Cast-in-place reinforced concrete retaining wall according to design drawings. The foundation is paved with 20 cm thick gravel cushion and rammed into the foundation soil with a rammer. In order to increase the friction coefficient of the base. The base cushion of prefabricated retaining wall is 10 cm thick of C10 concrete cushion.
    4、鋼筋安裝:現澆鋼筋基礎先安裝基礎鋼筋,預理墻身豎向鋼筋,待基礎澆灌砼完后且砼達到2.5Mpa后,進行墻身鋼筋安裝。
    4. Installation of reinforcing bars: First, the cast-in-place reinforcing bars are installed, and the vertical reinforcing bars of the wall are prefabricated. After the foundation is poured with concrete and the concrete reaches 2.5 Mpa, the reinforcing bars of the wall are installed.
    預制鋼筋砼擋土墻的基礎鋼筋分二次安裝,第一次安裝最底層的鋼筋,基礎達到一定強度,安裝好預制墻身后,再安裝第二階的基礎鋼筋。
    The foundation reinforcement of prefabricated reinforced concrete retaining wall is installed twice. The first time is to install the bottom reinforcement. The foundation reaches a certain strength. After the prefabricated wall is installed, the second-order foundation reinforcement is installed.
    5、現澆砼基礎:按擋土墻分段長,整段進行一次性澆灌,在清理好的墊層表面測量放線,立模澆灌。
    5. Cast-in-place concrete foundation: according to the length of the retaining wall section, the whole section is irrigated one-time, the surface of the clean cushion is measured and laid out, and the vertical mould is irrigated.
    6、現澆墻身砼:現澆鋼筋砼擋土墻與基礎的結合面,應按施工縫處理,即先進行鑿毛,將松散部分的砼及浮漿鑿除,并用水清洗干凈,然后架立墻身模板,砼開始澆灌時,先在結合面上刷一層水泥漿或墊一層2―3公分厚的1:2水泥砂漿再澆灌墻身砼。
    6. Cast-in-place wall concrete: The joint of cast-in-place reinforced concrete retaining wall and foundation should be treated according to construction joints, i.e. first chiseling, chiseling the loose part of concrete and floating slurry, cleaning with water, and then erecting the wall formwork. When concrete begins to pour, first brush a layer of cement slurry or cushion a layer of 2-3 cm thick 1:2 cement mortar on the joint surface and then pour the wall concrete.
    墻身模板采用光面七夾板拼裝,豎枋用8×10cm枋間距為40cm,用鋼管作圍楞,用8×10cm的木枋作斜撐進行支撐,側模用ф16的螺栓對拉定位,螺栓間距為80cm,螺栓穿孔可采用內徑為20―25cm的硬塑料管,拆模時,將螺栓拔出,再用1:2水泥砂漿堵塞螺栓孔,墻身模板視高度情況分一次立模到頂和二次立模的辦法,一般4米高之內為一次立模,超過4米高的可分二次立模,亦可一次立模。當砼落高大于2.0m時,要采用串筒輸送砼入倉,或采用人工分灰,避免砼產生離析。砼由砼加工廠,用砼運輸車運至現場,在墻頂搭設平臺,用吊機吊送砼至平臺進行澆灌,砼澆灌從低處開始分層均勻進行,分層厚度一般為30n,采用插入式振搗器振搗,振搗棒移動距離不應超過其作用半徑的1.5倍,并與側模保持5―10cm的距離,切勿漏振或過振。在砼澆灌過程中,如表面泌水過多,應及時將水排走或采取逐層減水措施,以免產生松頂,澆灌到頂面后,應及時抹面,定漿后再二次抹面,使表面平整。
    The wall formwork is assembled with seven smooth splints, the vertical spacing of 8 *10 cm is 40 cm, the steel tube is used as the enclosure, the wooden silk of 8 *10 cm is used as the diagonal brace to support, the side die is positioned by the bolt of 16, the bolt spacing is 80 cm, and the bolt perforation can be made by the rigid plastic pipe with the inner diameter of 20-25 cm. When removing the die, the bolt is pulled out, and then the bolt hole is blocked by 1:2 cement mortar. The wall formwork height is apparent. In general, the method of dividing one-time die into top and second-time die is one-time die within 4 meters of height, and divisible two-time die over 4 meters of height can also be one-time die. When the falling height of concrete is more than 2.0m, the concrete should be transported into silos by series barrels or by manual ash separation to avoid the segregation of concrete. Concrete is transported from concrete processing plant to site by concrete truck. Platform is erected on the top of the wall, concrete is lifted by crane to the platform for pouring. Concrete pouring is carried out evenly from the lower part. The thickness of the layer is generally 30n. Inserted vibrator is used to vibrate the concrete. The moving distance of the vibrating rod should not exceed 1.5 times of its acting radius, and the distance between the concrete truck and the side formwork should be kept 5-10cm, so as not to leak or overvibrate. In the process of concrete pouring, if the surface bleeds too much, the water should be drained away in time or water reduction measures should be taken layer by layer, so as to avoid loose roof. After pouring to the top, the surface should be smeared in time, after slurry fixing, and then twice to make the surface smooth.
    砼澆灌過程中應派出木工、鋼筋工、電工及試驗工在現場值班,發現問題及時處理。
    In the process of concrete pouring, carpenters, reinforcing bars, electricians and test workers should be sent on duty on site to find problems and deal with them in time.
    砼強度件制作應在現場拌和地點或澆灌地點隨機制取,每工作班應制作不少于2組試件(每組3塊)。
    The concrete strength parts shall be made at random at the site of mixing or irrigating, and no less than two groups of specimens (3 pieces in each group) shall be made in each working class.
    砼澆灌完進行收漿后,應及時灑水養護,養護時間最少不得小于7天,在常溫下一般24小時即可拆除墻身側模板,拆模時,必須特別小心,切莫損壞墻面。
    After grouting, concrete should be sprinkled and maintained in time. The curing time should not be less than 7 days. The side formwork of the wall can be removed 24 hours at room temperature. When removing the formwork, special care must be taken to avoid damaging the wall.
    7、伸縫縮、沉降縫及泄水孔的處理:
    7. Treatment of expansion joints, settlement joints and drainage holes:
    現澆灌鋼筋砼擋土墻的伸縮縫和沉降縫寬2cm(施工時縫內夾2公分厚的泡沫板或木板,施工完后抽出木板或泡沫板)從墻頂到基底沿墻的內、外、頂三側填塞瀝青麻絲,深15cm。
    The expansion joint and the settlement width of the reinforced concrete retaining wall are now watered 2cm (sandwiched 2 centimeters thick foam board or wood plank in the construction joint, and after the construction is finished, wood or foam board is drawn) from the top of the wall to the base, and the three sides of the inside, outside and top sides of the wall are filled with pitch hemp, deep 15cm.
    擋土墻泄水孔為ф10cm的硬質空心管,泄水孔進口周圍鋪設50×50×50cm碎古,碎古外包土工布,下排泄水孔進口的底部鋪設30cm厚的粘土流水槽鋼模具 不銹鋼鑄件 扭王字塊模具 井蓋鋼模具 標志樁模具 調匝式消弧線圈 風冷控制柜 烤漆龍層并歷夯實。
    The drain hole of retaining wall is a rigid hollow pipe of 10cm. The drain hole is surrounded by 50 *50 *50cm crushed ancient materials, which are wrapped with geotextiles. The bottom of the lower drain hole is laid with 30 cm thick clay layer and compacted

    返回新聞

    聯系電話
    17732221601

  • <rp id="no09e"></rp>
    <tbody id="no09e"></tbody>

    <button id="no09e"><acronym id="no09e"><u id="no09e"></u></acronym></button>
  • 
    

    <rp id="no09e"><acronym id="no09e"><u id="no09e"></u></acronym></rp>
  • 亚洲国产精品热久久_最新国产精品久久精品_捆绑白丝jk震动捧娇喘视频_亚洲欧洲另类春色校园小说